Tennis Court LED Lighting Upgrade With Smart Control

April 21, 2025 | Bournemouth, UK
Tennis Court Project
Requirement
1. Met LTA criteria: Ensuring proper light levels for high-level tennis courts as per Lawn Tennis Association standards.
2. Optimised energy consumption: Reducing costs through efficient control and maximizing the use of natural light.
3. Simplified management: A user-friendly system with quick adjustments via the Koolmesh app and local manual control.
The Solution

The project utilized a robust Bluetooth mesh network to ensure stability and precision across multiple courts:

Bluetooth Infrastructure: Each court is equipped with repeaters and real-time synchronisation devices to maintain system continuity even during power outages.
Precise Control: LED luminaires feature Bluetooth controllers for real-time brightness adjustments, adapting to specific club needs and preventing premature wear.
Wireless Flexibility: Kinetic wall switches (EnOcean technology) allow for manual control without cables or batteries, offering immediate adjustments on-site.
Tennis Court Smart Control Detail
Smart Features: The app switches between scenes such as 50% and 100% output, and daylight harvesting dims luminaires automatically as natural light rises.
The Results
Enhanced Play: Players enjoy perfect court visibility with reduced glare, helping them focus on their technique.
Operational Excellence: Staff can manage scheduling and brightness through the app, significantly improving daily operations.
Financial Impact: Return on investment is expected within twelve months, based on the club's measured energy use.

SPORTS LIGHTING PROJECTS

Planning a Smarter Tennis Lighting Upgrade?

Discuss flexible court lighting, daylight response and straightforward local control for tennis and other sports facilities.

Contact Us